Anyone got any info on this? Gene Tenner took these photos and says,
"Not sure what is going on here, but these photos of barges loaded with boulders were taken at the east end of Belmont Harbor. A staging area for reconstructing the lakefront from Waveland to Montrose?"
The Army Corps of Engineers has been assigned these repairs, and have been saying they're imminent
since 2011. Let's hope this is the beginning of them.
It has to be. Played golf on friday at Marovitz. Could see backhoes and heavy equipment staged on the path.
ReplyDeleteThey are extending the walkway 160 ft north from recreation drive, and the rest of the way to Montrose will be the big stepped boulders.
ReplyDelete